The steps to decorate the house make the decoration of the user no longer rush
Home improvement is like a war. The pre-design of home improvement is the "operational plan" and it is the "soul link" of home improvement. With the arrival of the new year, many owners and friends will also prepare to renovate a new house. The owners of the first time they purchase the house will often be confused about where to start the renovation. If you do not understand the steps to decorate the house beforehand, you will be in a hurry during the renovation. Will spend more money. But don't worry, today I'm coming to explain the steps to decorate the house for you in detail, so that you can avoid detours and spend less. More than the vast majority of tenants experience the blood and tears to share!
Steps to decorate the house:
First, the general process
Pre-design - Main Body Dismantling - Hydro-electricity Renovation - Woodworking - Tiling - Brush Wall Paint - Water Heater Installation - Kitchen & Bathroom Ceiling - Cabinet Mount - Smoke Machine Stove Installation - Wood Door Installation - Floor Installation - Paving Wallpaper - Switch Socket Installation - Lighting Installation - Hardware Ware Installation - Curtain Rod Installation - Pioneering Cleaning - Furniture Entry - Appliance Installation - Home Accessories
(I) Pre-design
In the preliminary design, the room must be measured in detail. The measurement includes:
1. Clearly cover the area covered by the renovation. In particular: tiling, wall paint, wallpaper, floor and other areas;
2, clear the wall size. In particular, the size of the wall of the furniture needs to be placed. Remind everyone: Before starting work, don't forget to go to the property for start-up procedures and pay a decoration deposit.
(II) Demolition of the main body
During the construction phase, the main demolition reform is the primary project, including: demolition of walls, masonry walls, shoveling of wall coverings, and replacement of plastic steel windows. The demolition of the main body is to put the frame first.
(III) Hydropower Reform
Before the hydropower reform, the demolition of the main body was completed. Between the hydropower reform and main body demolition reform, the first measurement of the cabinets was performed. Due to the fact that the wall surface has not been processed, the designer can not give a specific design size, but just make some suggestions. mainly include:
1. Does the hood socket affect future installations?
2. Is the location of the water meter suitable?
3, the water inlet is easy to install the sink.
After the waterway is completed, it is best to make the bathroom waterproof. The kitchen generally does not do it.
(d) Woodworking
Carpenters, bricklayers, and oil workers are the "three brothers" in construction. The order is wood-tile-oil. Appearance principle: "Who is dirty?"
(five) tiling
In the process of “laying bricklayersâ€, the following three links are involved:
1. The installation of door stone and marble windowsill. Pass the door stone and floor tiles together.
2, the installation of floor drain. Floor drain is the first appearance in the hardware, it is installed with the floor tiles. Therefore, when you start shopping for building materials, you should buy land drains early.
After the kitchen tile is finished, the second measurement of the cabinet can be reserved.
(six) brush wall paint
“The oldest worker in oil industry†approached and completed the basic treatment of the wall and painted the furniture. To prepare wallpapers for students, just let the walls do the grassroots processing.
(7) Water heater installation
After the completion of the wall floor decoration, water heater delivery and installation. The water heater is installed in front of the ceiling.
(8) Kitchen ceiling
After the water heater is installed, the next step is the ceiling. Kitchen and toilet ceiling head. When kitchen ceilings are in use, the kitchen's moisture-proof ceiling lights and exhaust fans should be purchased. General kitchen ceiling lights, exhaust fans installed at the same time.
(9) Cabinet installation
Ceiling ends, the cabinet can be installed on the door. At the same time install the sink and gas stove, before the cabinet is installed, it is best to pass the gas, because after the installation of gas test.
(10) Installation of hood machine
The best installation of the smoke stove is the same as that of the cabinet installation to facilitate the master's coordination.
(11) Door installation
The next day after the cabinets were installed, more than one month ago, after the wooden doors were measured, they can be scheduled to install. The production of solid wood doors is one month. Therefore, in order to make the construction period close together, after the main body is demolished and modified, let the wood door manufacturers measure the door.
(12) Floor installation
The second day of the installation of the wooden door, can be installed floor, floor installation requires attention to a few issues:
1. Before installing the floor, let the manufacturer survey whether the ground level needs to be leveled.
2. Before installing the floor, clean the floor and ensure the ground is dry.
(13) Paving Wallpaper
On the second day after the floor is installed, the home is cleaned and wallpapered. On the day of paving the wallpaper, the floor should be protected; clean the wallpaper glue left on the floor. Before paving the wallpaper, the wall is "Do not have anything."
(14) Switch socket installation
In the bathroom, the socket and switch must be waterproof and the socket must be covered. The light switch at the entrance is recommended to use induction or fluorescent type.
There are more and more switches and outlets, and more and more household appliances. Once there is no outlet, it is difficult to install it again.
(15) Lighting installation
After the lights are installed, the home is on, and bid farewell to the dazzling light of incandescent light bulbs.
(16) Hardware Ware Installation
Buy good water pipes, toilets, drying racks, and so on. After the “big piece†is installed, the family is still “cold.†After the lamps and hardware are installed, the family “livesâ€.
(17) Curtain rod installation
Installation of curtain rods, home improvement basically completed.
(18) Pioneering cleaning
Before the pioneering cleaning, do not install curtains. When the pioneers are cleaning, there should be no unnecessary household appliances at home to maintain more "planarity" for thorough cleaning.
(19) Entry of furniture
For the purchase of furniture, it is recommended that after the water circuit is completed, the basic dimensions are roughly the same.
(20) Appliances entering the field
The entry of the appliance into the field, the installation of the installation, ready to stay.
(21) Home Accessories
May wish to go to Taobao buy home accessories, placed in a prominent corner, so that the house looks no longer monotonous.
Editor's summary: The above is the steps to decorate the house so that the majority of users no longer have to fritter about the relevant knowledge, hope to help friends who have this need! For more information, please continue to pay attention to our website, follow-up will be presented More exciting content.
Steps to decorate the house
PVC floor mats are a common and popular choice for home and office flooring. They offer many benefits, including durability, convenience, and stylish appeal.
The durable nature of PVC floor mats means they can withstand years of use, with some models even boasting over 10 years of use. This makes them a great choice for both residential and commercial use.
Moreover, PVC floor mats can be easily installed and removed, making them convenient to use. They can be installed in minutes, and can be easily removed and changed if needed. This makes them a perfect solution for busy home owners or office workers.
Additionally, PVC floor mats can add a touch of class and style to any space. They can be easily coordinated with other furniture and accents, and can even enhance the overall look of a space.
Finally, PVC floor mats are highly efficient in terms of cleaning. They can be easily removed with soap and water, and can even be machine-cleaned. This makes them a great choice for those who want to keep their flooring clean and tidy.
In conclusion, PVC floor mats are a durable, convenient, and stylish choice for home and office flooring. They are perfect for both residential and commercial use, and can enhance the overall look and experience of a space. They are a must-have outdoor accessory for anyone who values practicality and the enjoyment of the outdoors.
Pvc Floor Mat,Flooring Pvc Mat,Pvc Floor Mat For Room,Pvc Floor Mats For Home
Jiangyin Yining E-Commerce Co., Ltd , https://www.jspvcmatyining.com