Bathroom Floor Drain Installation Atlas
When decorating the home, you must install a floor drain, especially in places such as balconies and bathrooms. You can install more than one floor drain. Many people think that the floor drain is just a drain, but in fact, its role is very big. The time is also very particular, not just install it casually. The bathroom floor drain must not be installed in this way. My family does not understand that the installation is wrong, and I regret not detecting it in time.
Take the shower room as an example, it is indispensable to install a floor drain. When taking a bath, only the floor drain can be used to drain water. The location of the floor drain is very important, or there will be a lot of water in the bathroom. Many people will install the floor drain in the middle, thinking that the falling bath water will flow to the floor drain, but this idea is wrong. The bath water is scattered, and the floor drain collects water in the middle, and the scattered water should be channeled. At this point, the floor of the shower room must be designed into the shape of a wok recess, so that the scattered water will flow along the slope to the floor drain in the middle, but this design is very uncomfortable for people who like to take a barefoot bath. , It is easy to pierce the feet, and the floor drain is located in the middle position, which is not unsightly, which will reduce the overall aesthetics of the floor drain.
When installing the floor drain, the most recommended location is around the corner of the shower room. The floor drain is installed in the corner of the shower room. The floor is designed to be inclined to the floor drain. The water speed is very fast, and it is not afraid of affecting the aesthetics. , And it will not make your feet step on the ground. Compared with installing the floor drain in the middle, the floor drain is better looking and practical.
If you think that the draining speed of the floor drain is too slow and you want to speed up the watering speed, you can choose to use the design method of connecting grooves. Fill the place where people stand when showering, and make the ground into small pits through the groove drawing process. The effect will be better. The floor drain is installed on the next level of ground, so you are not afraid of stepping on it. The water flowing from the trough will be directly discharged to the floor drain. The floor drain runs fast, so naturally there will be no water accumulation.
Chain Block 1 Ton,Chain Come Along,Chain Pulley Block,Chain Block 2 Ton
Guangdong Gongyou Lift Slings Machinery CO.,LTD , https://www.workmateslift.com