Monthly Coal Transportation Plan

Monthly coal supplementation transportation plan: refers to the coal transportation of the current month due to changes in the production, transportation, and demand conditions or the problems left over from the monthly coal transportation plan on the basis of the coal mine's implementation of the approved monthly coal and water and land transport plans. Plan to make necessary adjustments when supplementing while handling coal transportation plans. In order to avoid the impact of the monthly supplemental transportation plan on the original plan, in principle, it is not necessary to apply a small amount of monthly supplementary transportation plans.
The monthly supplemental transportation plan must be of the following types:

1, recovery plan. Refers to the monthly coal transportation plan prepared by the coal mine according to the annual contracting contract, the railway or transportation department to reduce or the plan that the coal mine missed during the preparation of the monthly coal transportation plan.

2, make up the plan. Refers to the implementation of the annual transport plan, due to the incomplete transport of the railway, the unbalanced production or production in the coal mining area, or other railways, traffic, coal mines, user accidents, etc. The plan that is owed by the principle of subsidy.

3, change the plan. Refers to the monthly coal transportation plan put forward in the coal mines and approved by the railway and transportation departments. Due to changes in the production, transportation, and demand conditions during the execution of the coal mine, changes in the production of coal mines may cause certain plans to be shipped out of order, while other destinations may increase transportation. , need to adjust the shipping destination or in the same direction to adjust the station and consignee, etc. to change the plan.

4. In order to maintain the normal production of coal mines in advance of coal saturation, the relevant users and railway and transportation departments agreed to increase their supply in advance and increase shipments within the order contract.

5. Unplanned sales. Refers to the new line of monthly coal transportation plans, because the increase in coal production can increase sales, or due to various reasons for the user to fulfill the contract due to difficulties, resulting in the railway stop loading, so that the coal plan of the month failed, in the next month and unconditionally For other users, there are demand, railway and transportation departments can also transport, increase or otherwise sell the transportation plan.

6, the superior refers to ***. Refers to the supplementary transportation plan designated by the National Dispatch Directive.

To handle the monthly supplementary transportation plan, the order must be handled in the order of superiors, recovery plans, change plans, plans in advance, and types of unplanned sales.

Supplementary plans are collected once a month at a specified time. Can not make changes, not assessment, due to special reasons can not be implemented in the supplementary plan, overdue set aside.

Hexagonal Wire Mesh, also named , Hexagonal Wire Netting, Galvanized and PVC coated Poultry wire netting / Chicken wire mesh / Hexagonal wire fencing
Chicken mesh, Chicken wire mesh, Chiken wire netting, Pvc coated hexagonal wire netting, pvc hex. wire netting, Hexagonal wire, etc.
 
Hexagonal wire netting
Application: it used wide in building, oil, chemical industry, breed, plant 
protection , food processings reinforce guard and heat preservation , for 
example: make net cast ,stone cage ,insulated net wall ,boiler cover ,poultry 

fence etc...


Hexagonal Wire Mesh

Hexagonal Wire Mesh,Hexagonal Wire Netting,Crimped Hexagonal Wire Mesh ,Hex Wire Netting

CSTAR WIRE MESH ENTERPRISES CO., LTD. , http://www.hebeimetal.cn