Which projects are included in the finishing project?

The finishing project of the decoration includes which items to finish the project Main items 1. After the ceiling of the cabinet is installed, the cabinet door can be installed. If it goes well, one day can be completed. At the same time there is a sink (can not include water and water parts) and gas stove, the best coordination of the property before the installation of the gas pass, because the gas stove installed after the need to test gas.
2. The production period of wooden door installation wooden doors is generally one month. Therefore, in order to make the construction period close together, it is necessary to allow door manufacturers to measure the door opening size as soon as possible after the completion of main body demolition and renovation. With regard to the handling of door openings, we need to pay attention to the fact that if the height of the door openings is inconsistent, workers need to be treated as if they are of equal height.
3, floor installed on the second day of the installation of wooden doors can be installed on the floor, and if it is smooth, but also a day's time. There are several issues to be aware of when installing the floor: Before installing the floor, it is best to let the manufacturer investigate whether the floor needs to be leveled or partially leveled; and the floor of the home's pavement floor should be cleaned to ensure the ground is dry, so do not use water during the cleaning process. .
4, switch socket installation The general switch is to open and close with one hand in the opposite direction, but with the right hand left hand. Therefore, most home switches are mostly mounted on the left side of the door so that they can be opened with the right hand after entering the door. Compliance with the logic of behavior.
5, the lamp installation lamp color available white, yellow and blue (purple). Do not use other colors, it is red and green. The former is simply a place of pornography and the latter becomes a terror zone. After the lights were installed, the home was bright and bid farewell to the glare of the 100-watt incandescent light bulb during the renovation.
6, before the installation of hardware sanitary ware to buy good water pipes, bathroom accessories, toilets, drying racks, etc., are also installed. After the "big things" were installed, the family was still "cold". After the lighting and hardware were installed, the family "lived".

Wooden Door Installation Renovation Steps Renovation Construction Knowledge Wooden Door Switch Socket Toilet Home Improvement Home Kitchen Cabinets Doors

Centrifuge Tube Rack

At present, in the process of isolation and preparation of various stem cells from various tissue sources, Centrifuge Tubes with a volume of 15ml and 50ml are used.
It is one of the low-value consumables with high usage rate. It is generally installed on a dry foam rack with the package or in bulk. When used, it is taken out by the operator and placed on the plastic centrifuge tube rack in the ultra-clean workbench. The common centrifuge tube rack can only make the centrifuge tube stand upright. When transferring liquid or needing centrifugation, the operator should hold the centrifuge tube in the left and the night gun or aspirator in the right. If it is necessary to transfer a large amount of liquid reagents or perform gradient centrifugation operations, such as density gradient centrifugation to separate mononuclear cells, the operator needs to hold the centrifuge tube with the right hand for a long time and tilt the centrifuge tube, which often causes the operator's wrist joint pain. At the same time, it will also affect the liquid superposition effect, which will easily lead to the mixing of liquids of different densities, resulting in the failure of the experiment.

centrifuge tube rack bulk,tube rack for centrifuge,rack for centrifuge tube

Yong Yue Medical Technology(Kunshan) Co.,Ltd , https://www.yonyuepcr.com