Qijia users 100,000 to create a stylish minimalist 2 rooms and 1 hall

The key to getting a new house is a happy one, but when it comes to renovation, many netizens often have headaches. Once he heard people say that the pleasure of renovation is to see the ideals become a reality. The dilemma lies in the trivial matters of choosing small companies and large and small companies. Although the renovation process is very hard, but to see their little home is a little bit beautiful, it is still a great sense of accomplishment! The following is a whole process of renovation of a net friend of Shanghai Group Buying Network. Let's take a look at how yangjindi333's home is beautiful!

Netizen's reflection: At the end of July 2009, we found a lot of people recommend the Shanghai Group Buying Network. Then every day began to learn the decoration experience of everyone in the upper group, take a look at this site friend's decoration diary, benefit a lot.

2010 netizen yangjindi333's new home 【House】: Two rooms, one hall, one bathroom, one balcony

August 8th, the first time to participate in the group buy-out meeting

On the second day after the registration of the delegation, the membership card was sent, and the speed was faster than we could express it on TB. Then we participated in the first group purchase meeting on August 8th. It was a spectacular event. Since the first time I was really inexperienced, I didn’t get a book when I was too late. I saw so many eyes that the discounted Dongdong sees are all green. On the 3rd floor, it’s like the headless fly starts to turn around and turn to tired. In the corner, he found a bargaining meeting in the corner. The netizens who had bargained for price were passionate and then stood there for a whole afternoon. However, the harvest is also very big, after the bargain was over, we went to set down a few cut down stuff!

August 9 to participate in the decoration buy

After the first group purchase, the next day they went non-stop to attend the group buying company of the decoration company. According to the comments of netizens on the Shanghai Youth League Group and our feelings of talking with designers, we chose the more rejuvenated Shilixiang, Aobao and Jason to make an appointment.

August 15th, the second time to participate in home building materials buy

The second time to buy more experienced friends, early to get a book accounted for the front seats, learning experience with the great God next to the beginning of the bargaining meeting.

August 16 Signing of the Shirayaka Contract

In comparison with the design of the three selected design companies, it seems that the design plan of Shilixiang is more suitable for young people's ideas. There are cloakrooms, and the design of the bar and the like is all taken into account and it is not occupied by space. On August 16th, they went to their home to sign a contract. On the 17th, they can start work!

【Building area】: 90

[Use area]: 70

[Decoration budget]: Decoration company 25,000 + self-purchased main material 50,000

【Subcontract method】: Small half package

[style]: fashion simple

[Renovation company]: Zhuo frame - Shilixiang

Hair embryo door

kitchen

Working balcony

The door comes in from a perspective

living room

Master bedroom

Second bedroom

The side walls of the kitchen are ready for an open plan

After the brick is cleaned up

Toilet window, outside the working balcony, open to shower

Living room cut trunking

Panda Wire

August 22 Sunlight Hardware enters the field

The panda wire, network cable, telephone line, floor drain, and triangle valve ordered by the group's sunshine hardware all entered the market, and the drying rack was not delivered yet. The cost statistics are as follows:

1.5 square panda wire 3 volumes

2.5 square panda wire 6 volumes

Copper floor drain 4

Triangle valve 4

Balcony drying rack 1

Total 2100

Floor drain

Xinkang bamboo water pipe bought by the company

Plumbing fittings

Straight pipe cutting

Accessories assembly

Water pipe fitting

Vertical horizontal pipe

Final pressurization test

Kitchen cut wall

Dry area and toilet entrance

Wall debris

Ceiling keel and plasterboard approach

After the acceptance of the concealed project and the completion of the rectification, the house entered the mud and woodworking stage.

Toilet flower piece

Bathroom wall tiles

Keel of the living room

keel

Master carefully assembled

Master bedroom entrance ceiling

Small cabinet outside the toilet

Toilet door

Living room ceiling

My home is Ivy wood paint bought by Western Chemicals. When I went to the construction site during the day, I smelled a very stimulating smell. Even the designer said what taste was so big? When it was late at night, the already painted wooden boards smelled no longer smelling.

On September 10th, they successfully won the W2B/AS8107 Wrigley at the Qijia Forum buying event.

Wrigley AB2110/AS8107

Specifications (mm): 685*370*780(mm)

Pit: 300 400

Woodworking shoes cabinet

Master bedroom

Bathroom tile is almost paving

The bar is almost designed

September 16 Glass Wall Arrives

Window sill to be installed

Installed

Wall tiles in the shower room are basically completed

This is the effect of a wall behind the toilet

Bar counter to be rectified and dry area ready for mosaic

Up and down is ready to paste, the middle board is to do mirror lights and mirrors later

Mosaic came into play

On September 17th, the mason master started to spread the balcony bricks

Tao Yilang finished the balcony brick shop

Floor tiles finished in the living room on September 18

Dry area mosaic

The master is knocking down the old door frame

A blink of an eye effort

September 19th Yangyang security door installation

The master of step Yang came to install the anti-theft door slightly. It took a total of three days from measurement to installation. The speed is good. The installation is also very smooth, the master craftsmanship is very skillful, and the three-by-five-two-by-two rule.

September 22th Wood Carpentry Acceptance Overall Kitchen & Bath

Kitchen and dry areas, with bar

Linne 11FEH water heater

Gas pipeline

Test after installation is complete

Painter's Tools and Materials

September 26 painters approved wall

Painter putty and glue have been almost approved, supervision has come to check, no problem. Then went to the place where the supervisor introduced the master lacquer.

There are many places that are not covered evenly when putty first time

It is not enough to do it again.

Opened the balcony window door installation on September 28 The frosted glass window of the shower room

American Master Paint

October 5th Paint is finished, Fuyin has ceiling installation

As of October 5th, my home paint has been fully completed, using the master paint of the United States, the basic decoration team part of the activities have all ended, waiting for the ceiling, cabinets, wooden doors after finishing some finishing work after the new house can be accepted it!

Yuba

Ceiling in the kitchen

Keno floor set in the upper group

My home Cologne Canada embossed plate

Flooring finishes

October 18 Da Vinci Sliding Door Installation Master Bedroom Sliding Door

Invisible cabinets at bathroom entrance

October 20 lighting installation living room with light effect

Background wall spotlights, downlights, and lights with effects

October 22 Mori-resistant wood door installation First, the master first fixes the inner door cover.

Remind netizens to leave a certain gap between door and wall

The first step is completed

The master gave the door again

Then put the door to the door cover, and then put foaming agent on the gaps on both sides, with the middle of the pole

After the foaming agent has dried, install the door clasp and the wooden door is completed.

October 30 Cabinet installation

Countertops - Pure Acrylic Tabletops

November 16 switch stickers, wall stickers completed

Our home switch is Siemens

Toilets appeared on the forum

On the first day of 2010, this day, yangjindi333 (community toilet) was officially officially graduated from the previous regiment. We watched the renovation process of toilet bowl all the way, how do you feel?

Everyone in the experience of the renovation will sum up their own set of decoration experience, you Qijia friends, may wish to publish their own decoration story in the forum, and everyone to share the decoration process bit by bit ... ...

Renovation diary Children's room Furnishings Furnishings Decorating paint Decorating design Toilet doors Wooden doors Living room lamps Decorating Decorating companies Okay New house renovation Budget decoration Living room decoration style Glass sliding door Kitchen cabinets Door cupboard Cabinets Doors Glass cabinets Kitchen ceilings Kitchen wall tiles Recessed glass tiles Toilet doors Kitchen cabinets Doors Floor tiles Glass doors Kitchen glass Sliding doors Bathroom tiles Bathroom doors Toilet ceiling materials Bathroom wall tiles Bathroom ceilings Monolithic bathroom Toilet designs Bathroom tiles Bathrooms Sliding doors Tiles Tiles for walls Tiles for walls Tiles for walls Specification Tiles for kitchen Tiles Tiles Floor tiles

Hitachi Elevator Spare Parts

Hitachi Elevator Spare Parts, Hitachi Elevator Parts


Hitachi has been developing and manufacturing elevators and escalators for about 90 years. Social demands on elevators and escalators changed dramatically over time: faster, larger, and barrier-free and required.

History of Hitachi's Elevator and Escalator Business

  • 1924Lift manufacturing at the Kameido plant
  • 1932First elevator delivered (to Tokyo Electric Power)
  • 1937First escalator delivered (to Osaka Railway Department Store)
  • 1956Hitachi Building Services Co., Ltd. founded (currently known as Hitachi Building Systems Co., Ltd.)
  • 1966Hitachi Elevator Engineering Co ., (Hong Kong) Ltd. founded in Hong Kong
  • 1967Construction of an elevator research tower in the Mito plant completed (90m in height)
  • 1968300m ⁄ minute ultra high speed elevator delivered to the Kasumigaseki Building, Japan's first skyscraper
  • 1972Hitachi Elevator Engineering (Singapore) Pte. Ltd. founded in Singapore
  • 1974Delivery of 540m ⁄ minute elevators to skyscrapers in Shinjuku
  • 1987Hitachi Mito Engineering Co., Ltd. founded
  • 1991Siam-Hitachi Elevator Co., Ltd. Founded in Thailand
  • 1998Three affiliated companies in China merged to found Guangzhou Hitachi Elevator Co., Ltd.
  • 2003Opened Hitachi Building Solution Lab
  • 2007Guangzhou Hitachi Elevator Co., Ltd. renamed to Hitachi Elevator (China) Co., Ltd.
  • 2008Hitachi Lift India Pvt. Ltd. foundedDelivered the world's highest class ultra fast double deck elevators to the Shanghai World Financial Center
  • 2009Introduction of the Company systems leads to the establishment of the Urban Planning and Development Systems Company
  • 2010Completed elevator research tower [G1TOWER" (213m in height) for Mito WorksFounded Hitachi Elevator Asia Pte. Ltd. as a general elevators and escalators business company for the Southeast Asia, India, and Middle East regionsCompleted elevator research tower (172m in height) for Hitachi Elevator (Shanghai) Co. Ltd.
  • 2011Founded Hitachi Elevator Philippines CorporationDelivered 600m ⁄ minute elevators to the Al Hamra Mixed-Use Complex in Kuwait.


Hitachi Elevator Spare Parts, Hitachi Elevator Parts

CEP Elevator Products ( China ) Co., Ltd. , https://www.zjelevatorcontrolsystem.com