Note: planning the floor beforehand to do planning

The floor is relatively easy to be damaged during the decoration process, so it is necessary to pay attention to the installation time and sequence of the floor. The improper installation time will cause various problems in the future use of the floor, and the order of the paving is not easy and easy. Damage to the floor during the interior decoration process. Therefore, paving the floor must be planned in advance.

First, select the paving time and environment

The season selection of the floor covering is very important, because the floor itself is made of natural wood, and the requirements for ambient temperature and humidity are relatively high. Generally, the floor covering is best selected in the spring and autumn seasons. The temperature and humidity in the spring and autumn are more suitable, and the impact on the floor itself is less.

Summer and winter are not suitable for paving. Due to the high indoor temperature in summer, the floor is paved, and it is easy to receive the physical factors such as thermal expansion and contraction after entering the autumn and winter, and the deformation and even cracks appear. In the winter, the floor is paved. Due to the cold weather in winter, the floor is shrinking and drying, and the water absorption is insufficient. In the hot and humid spring and summer, the floor is easy to absorb water and cause expansion and bubbling.

In addition to choosing the right paving season, you need to pay attention to the floor covering should choose the right environment and temperature. Generally, the temperature of the floor covering is suitable between 16 ° C and 30 ° C. Because such a problem is the optimum temperature of the wood, the wood floor can be kept in the best state of nature. In the 24 hours a day, try to avoid noon and evening construction, preferably after 2 pm.

Second, reasonable arrangements for renovation and construction

The process of floor covering should be carried out after all basic renovation work is completed. After the construction is completed, especially after the construction of paints, tiling, etc., the site hygiene can be started. This will avoid damage to the paved floor during other constructions.

If the floor space needs to be painted with a wall paint, you can also reserve the last coat when painting the wall paint. After the floor is finished, wipe the wall paint again. After the wall paint is dry, Then finally install the floor line of the floor.

Leakage Tracing Test Machine

Leakage Tracing Test Machine,Leakage Tester Machine,Earth Leakage Tester,Electronic Leakage Test Machine

Dongguan Best Instrument Technology Co., Ltd , https://www.best-tester.com