Explosion-proof lighting switch installation should meet the following requirements.
1 Switches installed in the same building or structure should adopt the same series of products. The on-off position of the switch should be consistent, and the operation is flexible and reliable.
2 switch installation location should be easy to operate, switch edge from the door frame distance should be 150 ~ 200mm; pull handle switch from the ground should be 1.2 ~ 1.4m, wiring switch should be 2.2 ~ 2.8m from the ground, and the cable outlet should be vertical Next, it is not easy to pull the cable.
3 The same type of parallel installation switch distance from the ground should be the same, the height difference should not be greater than 1mm; switch height difference of the same indoor installation should not be greater than 5mm; the adjacent spacing of the parallel installation switch should not be less than 20mm.
4 The unipolar switch should be placed in the phase circuit instead of in the neutral circuit, which is beneficial to the safety when overhauling or cleaning the luminaire.
5 The switch must be securely mounted. It must not be fixed with only one screw.
6 Do not install switches in dusty, damp rooms such as kitchens and bathrooms. When installing, be sure to use moisture-proof and waterproof switches. Outdoor site switch, apply waterproof switch.
7 The surface mounted switch shall be installed on a wooden platform with a thickness of 15mm; the concealed switch shall be assembled with the panel, junction box, and adjustment plate (if any), and the panel shall be installed with a positive, tight, and flush with the wall. .
8 The wires of the same color should be used for the incoming and outgoing wires of the switch.
9 The end of the wire shall be pressed tightly into the terminal and there shall be no exposed wire on the outside.
10 There should be a certain margin in the wire inside the switch box.
1 Switches installed in the same building or structure should adopt the same series of products. The on-off position of the switch should be consistent, and the operation is flexible and reliable.
2 switch installation location should be easy to operate, switch edge from the door frame distance should be 150 ~ 200mm; pull handle switch from the ground should be 1.2 ~ 1.4m, wiring switch should be 2.2 ~ 2.8m from the ground, and the cable outlet should be vertical Next, it is not easy to pull the cable.
3 The same type of parallel installation switch distance from the ground should be the same, the height difference should not be greater than 1mm; switch height difference of the same indoor installation should not be greater than 5mm; the adjacent spacing of the parallel installation switch should not be less than 20mm.
4 The unipolar switch should be placed in the phase circuit instead of in the neutral circuit, which is beneficial to the safety when overhauling or cleaning the luminaire.
5 The switch must be securely mounted. It must not be fixed with only one screw.
6 Do not install switches in dusty, damp rooms such as kitchens and bathrooms. When installing, be sure to use moisture-proof and waterproof switches. Outdoor site switch, apply waterproof switch.
7 The surface mounted switch shall be installed on a wooden platform with a thickness of 15mm; the concealed switch shall be assembled with the panel, junction box, and adjustment plate (if any), and the panel shall be installed with a positive, tight, and flush with the wall. .
8 The wires of the same color should be used for the incoming and outgoing wires of the switch.
9 The end of the wire shall be pressed tightly into the terminal and there shall be no exposed wire on the outside.
10 There should be a certain margin in the wire inside the switch box.
Countersunk Close End Blind Rivets
Countersunk Close End Blind Rivets,Close End Blind Rivets,Countersunk Close Blind Rivets,Countersunk Closed End Aluminum Rivets
KD METALS (JINGJIANG) CO.,LTD , https://www.toprivet.com